Environmental and Social Overview

The Overview complements the Block Ops tab, but addresses the baseline conditions in the concession area.

On the Overview page we like to present a quick summary of the concession area or areas where you operate. However, this is only possible if a description is already available, which is usually the case if ESIAs have been carried out.

If ESIAs have not yet been carried out then you are welcome to discuss with the iEMS team the option for carrying out an Environmental and Social Baseline Study. We can assist if you wish.

No two areas are the same, so if the information does not exist the Overview page can be left largely blank until such time as information is available.


© 2012 iEMS.  |  Working in conjunction with Invicta - Planning services to the Oil and Gas Industry.

Enquire Now!